Table of Contents
INDEX
- 155W power supply 1-6
- AC-input power supplies
- description 2-8
- handling 5-7
- removing 5-3 to 5-7
- agency approvals
- FCC
- Catalyst 5000 and Catalyst 5505 switches A-7
- Catalyst 5002 switch A-4
- Catalyst 5500 switch A-13
- Catalyst 5509 switch A-10
- safety
- Catalyst 5000 and Catalyst 5505 switches A-7
- Catalyst 5002 switch A-4
- Catalyst 5500 switch A-13
- Catalyst 5509 switch A-10
- air conditioning requirements 3-7
- airflow 3-14
- direction 2-4 to 2-7
- restriction 4-8
- site 3-2
- boot process, observing LEDs 5-23
- cable guide installation
- Catalyst 5000 and Catalyst 5505 4-15
- Catalyst 5500 4-27
- Catalyst 5509 4-21
- cable guides 4-27
- cables 1-2
- captive installation screws, for ESD prevention B-1
- Catalyst 5000 and 5505 switches 4-15, 5-17, C-3
- Catalyst 5000 series switches 1-3
- Catalyst 5000 switch 1-3, 1-8
- Catalyst 5000, 5505, and 5509 switches 5-4
- Catalyst 5002 switch 1-3, 1-6, 4-11, 5-21
- Catalyst 5500 switch 1-5, 1-12, 4-26, 5-3, 5-19, C-5
- Catalyst 5505 switch 1-4, 1-9
- Catalyst 5509 switch 1-4, 1-10, 4-19, 5-18, C-5
- central office
- DC-powered systems 3-14
- grounding 3-13
- chassis
- dimensions
- Catalyst 5000 and Catalyst 5505 switches A-6
- Catalyst 5002 switch A-2
- Catalyst 5500 switch A-12
- Catalyst 5509 switch A-9
- lifting 5-2, D-23
- warning against stacking D-38
- checklist, site planning 3-14
- checklists
- Catalyst 5000 and 5505 switch rack mount 4-15
- Catalyst 5002 switch rack mount 4-11
- Catalyst 5500 switch rack mount 4-26
- Catalyst 5509 switch rack mount 4-19
- site planning 3-14
- tools, required 5-21
- CO
- See central office
- command, show system 1-3
- configuration options, hardware 2-3
- connecting DC-input wires, Catalyst 5002 switch 5-21
- contamination, atmospheric 3-14
- contents, checking 4-5
- crimp tool 5-16
- current rating, chassis
- Catalyst 5002 switch A-3
- current ratings, chassis
- Catalyst 5000 and Catalyst 5505 switches A-6
- Catalyst 5002 switch A-3
- Catalyst 5500 switch A-13
- Catalyst 5509 switch A-9
- customer service vii, 5-3, 6-8
- DC grounding requirements 3-13
- DC-input power supplies
- connectors
- Catalyst 5000 and 5505 switches 5-17
- Catalyst 5500 switch 5-19
- Catalyst 5509 switch 5-18
- description 2-8
- handling 5-13
- installing 5-14 to 5-20
- removing 5-10
- terminal block connectors 5-22
- DC-input wires, connecting on a Catalyst 5002 switch 5-21
- determining power requirements 3-7
- determining power requirements and heat dissipation 3-7
- dimensions, chassis
- Catalyst 5000 and Catalyst 5505 switches A-6
- Catalyst 5002 switch A-2
- Catalyst 5500 switch A-12
- Catalyst 5509 switch A-9
- EMI recommendations 3-7
- environmental monitoring 2-12
- environmental requirements, site 3-2
- equipment racks
- See rack-mounting
- ESD damage, preventing B-1
- fans
- description 2-4
- installing 5-27
- redundancy 2-3
- removing 5-25
- removing and replacing 5-25
- troubleshooting 6-4, 6-7
- verifying installation 5-28
- features
- fault tolerance 2-2
- hot swapping 2-2
- redundancy 2-2
- field-replaceable units 4-8, 5-1
- filler plate, power supply 5-7
- Flash code, troubleshooting 6-5
- frequency, specifications
- Catalyst 5000 and Catalyst 5505 switches A-6
- Catalyst 5002 switch A-3
- Catalyst 5500 switch A-12
- Catalyst 5509 switch A-9
- FRU
- See field-replaceable units
- grounding requirements, DC systems 3-13
- grounding, central office 3-13
- guidelines
- lifting the chassis 4-9
- preventing ESD damage B-1
- rack mounting 4-7
- handling AC-input power supplies 5-7
- handling DC-input power supplies 5-13
- hardware descriptions
- configuration options 2-3
- fans 2-4
- power supplies 2-8
- heat dissipation
- Catalyst 5000 and Catalyst 5505 switches A-6
- Catalyst 5002 switch A-3
- Catalyst 5500 switch A-12
- Catalyst 5509 switch A-9
- determining 3-7
- hot swapping, description 2-2
- input power 3-14
- installing switches 4-6
- Catalyst 5000 and Catalyst 5505 4-14
- Catalyst 5002 4-11
- Catalyst 5500 switch 4-25
- Catalyst 5509 switch 4-19
- getting started 4-10
- lifting guidelines 4-9
- safety overview 4-2
- tools required 4-10
- troubleshooting 6-1
- L brackets, attaching 4-12, 4-16, 4-22, 4-28
- labels, chassis serial number 6-8
- LEDs
- power supply 5-10, 5-20, 6-4
- switching module 5-23
- lifting the chassis 5-2, D-23
- loading sharing 2-11
- memory
- Catalyst 5000 and Catalyst 5505 switches A-5
- Catalyst 5002 switch A-2
- Catalyst 5500 switch A-12
- Catalyst 5509 switch A-8
- microprocessors
- Catalyst 5000 and Catalyst 5505 switches A-5
- Catalyst 5002 switch A-2
- Catalyst 5500 switch A-11
- Catalyst 5509 switch A-8
- modules, troubleshooting 6-8
- output A-3
- PFC
- See power factor correction
- plugs 3-14
- power factor correction
- Catalyst 5000 and Catalyst 5505 switches A-6
- Catalyst 5002 switch 1-3, 1-6
- Catalyst 5500 switch A-12
- Catalyst 5509 switch A-9
- power receptacles
- proximity 3-14
- type 3-14
- power supplies
- 155W 1-6
- Catalyst 5002 1-3
- connectors
- Catalyst 5000 and 5505 switches 5-17
- Catalyst 5500 switch 5-19
- Catalyst 5509 switch 5-18
- description 2-8
- environmental monitoring 2-12
- fan assembly 2-13
- filler plate 5-7
- handling AC-input 5-7
- handling DC-input 5-13
- hardware description 2-8
- LEDs 2-12, 6-4
- load sharing 2-11
- redundancy 2-3, 2-9
- removal and replacement 5-2 to 5-20
- specifications
- AC with PFC, Catalyst 5002 switch A-3
- AC without PFC, Catalyst 5002 switch A-3
- Catalyst 5000 and Catalyst 5505 switches A-6
- Catalyst 5002 switch A-3
- Catalyst 5500 switch A-12
- Catalyst 5509 switch A-9
- DC, Catalyst 5002 switch A-3
- troubleshooting 6-3, 6-4, 6-5
- warnings and cautions 3-4
- power, input 3-14
- power, site
- Catalyst 5500 specific power requirement 3-7
- DC grounding requirements 3-13
- EMI recommendations 3-7
- general requirements 3-3
- warnings and cautions 3-4
- procedures
- checking the contents 4-5
- field-replaceable units 5-1
- identifying startup problems 6-3
- installing Catalyst 5000 and Catalyst 5505 switches 4-14
- installing Catalyst 5002 switches 4-11
- installing Catalyst 5500 switches 4-25
- installing Catalyst 5509 switches 4-19
- installing DC-input power supplies 5-14
- installing fans 5-27
- preventing ESD damage B-1
- removing AC-input power supplies 5-3
- removing AC-input power supplies, Catalyst 5000, 5505, and 5509 switches 5-4
- removing AC-input power supplies, Catalyst 5500 switches 5-3
- removing and replacing fans 5-25
- removing DC-input power supplies 5-10
- removing fans 5-25
- repacking Catalyst 5000 and Catalyst 5505 switches C-3
- repacking Catalyst 5002 switches C-1
- repacking Catalyst 5509 and Catalyst 5500 switches C-5
- terminal block cover installation (Japan only) 5-24
- verifying fan installation 5-28
- PS1 and PS2 LEDs, description 2-12
- rack-mount kits
- Catalyst 5000 and Catalyst 5505 switches 4-15
- Catalyst 5002 switch 4-11
- Catalyst 5500 switch 4-26
- Catalyst 5509 switch 4-19
- rack-mounting
- cable guides 4-27
- description 4-6
- guidelines 4-7
- maximum temperature 4-8
- wheeled racks 4-20
- receptacles, power 3-14
- redundancy
- dedicated circuits 3-14
- fan 2-3
- power supplies 2-3, 2-9, 3-3
- redundant features per switch 2-2
- removing AC-input power supplies
- Catalyst 5000, 5505, and 5509 switches 5-4
- Catalyst 5500 switches 5-3
- repacking switches
- Catalyst 5000 and Catalyst 5505 switches C-3
- Catalyst 5002 switch C-1
- Catalyst 5509 and Catalyst 5500 switches C-5
- safety
- ensuring safety 4-2
- overview 4-2
- working with electricity 4-4
- serial numbers, chassis 6-8
- shock and vibration 3-14
- show system command 1-3
- site planning
- Catalyst 5500 specific power requirement 3-7
- checklist 3-14
- DC grounding requirement 3-13
- EMI recommendations 3-7
- environmental requirements 3-2
- general requirements 3-3
- overview 3-2
- warnings and cautions 3-4
- specifications
- Catalyst 5000 and Catalyst 5505 switches A-5
- Catalyst 5002 switch A-2
- Catalyst 5500 switch A-11
- Catalyst 5509 switch A-8
- startup, identifying problems 6-3
- startup, troubleshooting 6-3
- supervisor engines
- slot location, Catalyst 5000 1-8
- slot location, Catalyst 5002 1-6
- slot location, Catalyst 5500 1-12
- slot location, Catalyst 5505 1-9
- slot location, Catalyst 5509 1-10
- troubleshooting 6-8
- switches
- Catalyst 5000 1-3, 1-8
- Catalyst 5000 and 5505 4-15
- Catalyst 5002 1-3, 1-6, 4-11
- Catalyst 5500 1-5, 1-12, 4-26
- Catalyst 5505 1-4, 1-9
- Catalyst 5509 1-4, 1-10, 4-19
- switches, Catalyst 5000 series 1-3
- switching module LEDs 5-23
- system specifications A-1
- temperature thresholds 2-12, 2-13, 3-2
- terminal blocks
- connectors, DC-input power supply 5-22
- cover installation (Japan only) 5-24
- tools
- crimp 5-16
- required 5-21
- troubleshooting
- contacting customer service 6-8
- fan assembly 6-4
- fans 6-7
- Flash code 6-5
- initial boot 6-2
- methodology 6-2
- modules 6-8
- power supplies 6-4, 6-5
- startup 6-3
- supervisor engine 6-4
- supervisor engines 6-8
- uninterruptible power source 3-4
- UPS
- See uninterruptible power source
- voltage
- AC input
- Catalyst 5000 and Catalyst 5505 switches A-6
- Catalyst 5002 switch A-3
- Catalyst 5500 switch A-12
- Catalyst 5509 switch A-9
- DC input
- Catalyst 5000 and Catalyst 5505 switches A-6
- Catalyst 5500 switch A-12
- Catalyst 5509 switch A-9
- warnings
- power supply bay high voltage 5-13, 5-15
- turning off power 5-10, 5-14, 5-21
- weight
- chassis
- Catalyst 5000 and Catalyst 5505 switches A-6
- Catalyst 5002 switch A-2
- Catalyst 5500 switch A-12
- Catalyst 5509 switch A-9
- power supplies
- Catalyst 5000 and Catalyst 5505 5-8
- Catalyst 5500 and Catalyst 5509 5-8
Posted: Tue Sep 26 10:38:07 PDT 2000
Copyright 1989-2000©Cisco Systems Inc.