Cisco SCE 2000 4xGBE Quick Start Guide, Rel 3.1
Prepare for Installation
Rack-Mount the SCE 2000
Connect the Power Supply Units
Connect the Management Interfaces and Perform Initial System Configuration
Cable the Line Ports
Installing a Service Control Application
Completing the Installation
Installing a Cascaded System
Troubleshoot Startup Problems
Cisco SCE 2000 4xGBE Quick Start Guide
All contents are copyright © 1992--2007 Cisco Systems, Inc. All rights reserved.
Important Notices
and
Privacy Statement
.