cc/td/doc/product/voice/c_access/vg_200
hometocprevnextglossaryfeedbacksearchhelp
PDF

Table of Contents

index

index

Numerics


100BaseT
See Ethernet

10BaseT
See Ethernet

A


AC power supply specifications   1-3

attaching brackets   3-5, 3-6

audience, for this document   ix

auxiliary port, connecting devices to   3-15

B


baffles and cooling air   2-6

baud rate, console terminal   3-14, 3-16

board layout   B-5

boot
ROM monitor   C-4
system images, recovering   C-8

brackets
attaching   3-5
attaching to chassis (figure)   3-8, 3-9
attaching wall-mount (figure)   3-9
identifying (figure)   3-5
installing, front panel forward (figure)   3-6, 3-7
see also installation
installing, rear panel forward (figure)   3-7
telco, installing (figure)   3-8

brackets, installing   3-4, 3-4  to 3-11

C


caution
chassis-cover replacement   B-11
DIMM handling   B-6
ESD   2-4
Flash memory SIMM replacement   B-8
for desk and table mounting   3-4
SIMM handling   B-9, B-10

chassis
closing   B-11
ground   2-4
opening   B-3
power supply considerations   2-6
rack-mounting   3-4
removing cover, (figure)   B-4, B-12
removing cover, holding (figure)   B-4
site, requirements   2-5
wall-mounting   3-9
weight   1-2

Cisco Connection Online   xii

commands
configuration register   C-6
context   C-6
debugging   C-6
dir   C-5
frame   C-6
help   C-5
meminfo   C-5
reset   C-6
ROM monitor diagnostics   x, C-1
stack   C-6
sysret   C-6
tftpdnld   C-6
xmodem   C-8

configuration
equipment-rack   2-6

configuration, site   2-5

configuration register command
changing settings   C-6

connecting
console terminal (figure)   3-15
Ethernet hub (figure)   3-12
modem (figure)   3-16

connections
console terminal   3-13
Ethernet   2-7
Fast Ethernet (figure)   2-8
modem   3-13
network   2-7
preparing for network   2-1

console port
baud rate settings   3-14, 3-16
connecting devices to   3-14

console terminal, connecting (figure)   3-15

context command   C-6

conventions, documentation   xi

cooling recommendations   2-6

cover
removal   B-3
replacement caution   B-11

customer service   xii

D


DC power, supply specifications   1-3

debugging commands   C-6

desktop
installation
mount caution   3-4

dimensions, chassis   1-2

DIMM
handling caution   B-6

dir command   C-5

documentation
conventions   xi
objectives   ix
ordering   xiii
organization   x
referenced and related   ix
software configuration   ix

DRAM
description   1-2
DIMM, removing/replacing (figure)   B-7

dynamic random-access memory, See DRAM

E


EIA/TIA-232
auxiliary port connections   3-15
console port connections   3-14

electricity, safety guidelines   2-2

electrostatic discharge
See ESD prevention

environment
operating and nonoperating   1-3
site   2-5

equipment-rack configuration   2-6

ESD prevention   2-4

Ethernet
10Base2   2-7
10Base5   2-7
10BaseT   2-8
connections   2-7

Ethernet hub, connecting (figure)   3-12

F


fan noise level   1-3

Fast Ethernet connections
Cisco VG200   2-8

FCC   1-4

features, hardware   1-1

feet, installing

Flash memory, replacing SIMMs   B-8

frame command   C-6

G


general site requirements   2-5

ground, chassis   2-4

H


hardware
features   1-1
installation procedures   3-1  to 3-16
specifications   1-2
troubleshooting procedures   A-1  to A-5
what to do after installing   3-16

help, technical   xii

help command   C-5

humidity specification   1-3

I


identifying the rubber feet (figure)   3-3

installation
brackets
desktop
general site requirements   2-5  to 2-7
network connections   3-11
preparing for   2-1
rack-mount   3-4
safety recommendations   2-1
system-code SIMMs   B-8
tools, parts, and equipment required   3-2
wall-mount   3-9

L


LAN connections   3-11

layout, system card (figure)   B-5

LEDs
illustrated   1-2
reading   A-3

M


maintenance procedures   B-1

meminfo command   C-5

memory, system-code SIMMs (Flash memory)   B-8

modem
connecting (figure)   3-16

modem, connecting   3-15

mounting
See rack equipment   2-6

mounting chassis on wall (figure)   3-11

N


nonoperating temperature   1-3

nonvolatile random-access memory
See NVRAM

NVRAM   1-2

O


Obtaining   xii

opening the chassis   B-2, B-3

operating environment   1-3

ordering
cables (contact customer service)   xii

P


power
specifications (AC and DC)   1-3
supply considerations   2-6

precautions, operating environment   2-5

procedures
installation   3-1  to 3-16
maintenance   B-1
opening the chassis   B-4
replacing
chassis cover   B-11
system-code SIMMs   B-8
troubleshooting   A-1  to A-5

processor specification   1-3

R


rack equipment
configuration   2-6
installation   3-4

rack-mounting chassis   3-4

rear panel
Cisco 2620 (figure)   1-2

recovering boot and system images   C-8

removing
DRAM DIMM   B-7
system-code SIMM   B-10

removing, chassis cover   B-11

replacing
chassis cover   B-11
Flash memory SIMM   B-9
system-code SIMMs   B-8

requirements site   2-5

reset command   C-6

rollover cable
identifying   3-13

rollover cable (figure)   3-13

rollover cable, identifying   3-13

ROM monitor diagnostics commands   C-6

rubber feet
installing
see also installation
installing (figure)   3-4

rubber feet (figure)   3-3

S


safety
ESD   2-4
general guidelines   2-1, 2-7
warnings   2-2
warnings translated   xii

service and support   xii

SIMM
handling caution   B-9
replacing   B-8
system-code (Flash)   B-8

site requirements   2-5

software
backing up before replacing SIMMs   B-8
replacing system-code SIMMs   B-8

specifications   1-2  to 1-3

stack command   C-6

static electricity prevention   2-4

support   xii

sysret command   C-6

system card layout (figure)   B-5

system-code, replacing SIMMs   B-8

system-code SIMM, removing/replacing (figure)   B-10

T


table-mount caution   3-4

technical support   xii

temperature specification   1-3

terminal, connecting   3-13

tftpdnld command   C-6

tools required for
DRAM SIMM replacement   B-3
installation   3-2
system-code SIMM replacement   B-8

translated safety warnings   xii

troubleshooting procedures   A-1  to A-5

V


ventilation recommendations   2-6

W


wall-mounting the chassis   3-9

warning
installation   2-3
safety   2-2

weight, chassis   1-2

X


xmodem command   C-8

hometocprevnextglossaryfeedbacksearchhelp
Posted: Sun Aug 12 00:20:28 PDT 2001
All contents are Copyright © 1992--2001 Cisco Systems, Inc. All rights reserved.
Important Notices and Privacy Statement.