Preparing to Install the
Cisco ONS 15104

Preparing to Install the
Cisco ONS 15104

This chapter describes the tasks you must perform before you begin to install the Cisco ONS 15104 and includes the following sections:

Before beginning any of the procedures in this document:

General Safety

The following guidelines will help to ensure your safety and protect the equipment. This list does not include all potentially hazardous situations, so be alert.

Safety with Electricity

Follow these basic guidelines when working with any electrical equipment:

In addition, use the following guidelines when working with any equipment that is disconnected from a power source, but still connected to telephone or network wiring:

Preventing Electrostatic Discharge Damage

Electrostatic discharge damage, which can occur when electronic boards or components are handled improperly, can result in complete or intermittent failures.

Following are guidelines for preventing ESD damage:

Caution Be sure to check the resistance value of the antistatic strap periodically. The measurement should be between 1 and 10 megohms.

General Site Requirements

This section describes the requirements your site must meet for safe installation and operation of your Cisco ONS 15104. Ensure that your site is properly prepared before beginning installation.

The location and the layout of your equipment rack are extremely important for proper system operation when you mount the Cisco ONS 15104 in the rack. Equipment placed too close together can cause inadequate ventilation, and can cause system malfunctions and shutdowns.

Be sure to plan your site layout and equipment locations to help avoid equipment failures and reduce the possibility of environmentally caused shutdowns. If you are currently experiencing shutdowns or unusually high errors with your existing equipment, these precautions may help you isolate the cause of failures and prevent future problems.

Configuring Equipment Racks

The following tips will help you plan a well-ventilated equipment rack configuration:

Figure 2-1 shows the location of intake or exhaust ports, and fans on the Cisco ONS 15104.


Figure 2-1:
Location of Cisco ONS 15104 Intake and Exhaust Ports and Fans


Caution Do not place anything on top of the Cisco ONS 15104 that weighs more than 10 pounds (4.5 kilograms [kg]). More weight on top could damage the Cisco ONS 15104.

Creating a Site Log

Keep a site log to record of all actions related to the Cisco ONS 15104 near the chassis where anyone who installs or configures the Cisco ONS 15104 can access it. Use the installation checklist (see the following section, "Inspecting the System") to verify installation. Site log entries might include the following:

Inspecting the System

Do not unpack the Cisco ONS 15104 until you are ready to install it. If the final installation site will not be ready for some time, keep the Cisco ONS 15104 in its shipping container to prevent accidental damage. Unpack the Cisco ONS 15104 after you determine where you want to install it.

The Cisco ONS 15104, cables, Cisco Connection Documentation CD-ROM or printed publications, and any optional equipment you ordered might be shipped in more than one container. When you unpack each shipping container, check the packing list to ensure that you received all of the following items:

Inspect all items for shipping damage. If anything appears to be damaged, or if you encounter problems when installing or configuring your system, contact a customer service representative.

Required Tools and Parts

You will need the following are the tools to install the Cisco ONS 15104:


Note Single-mode long-reach simplex cables with SC connectors are available from the following cable vendors: AMP, Anixter, AT&T, Red-Hawk, and Siemens. These cables are not available from Cisco Systems.

Installation Checklist

The installation checklist lists the procedures for initial hardware installation of a new
Cisco ONS 15104. Mark the entries as you complete each procedure. Make a copy of this checklist for each Cisco ONS 15104 in your site log.

Installation checklist for site_______________________________________________________

Regenerator name_______________________________________________________________

Task Verified by Date

Installation checklist copied, distributed

Background information placed in site log

Cisco Connection Documentation CD-ROM
or printed documentation received

Cisco ONS 15104 received

Cable accessory kit received

Required tools available

Additional equipment available

Site power voltages verified

Initial electrical connections established

ASCII terminal or PC attached to console port

Startup sequence steps completed

Initial system operation verified

Software image verified

Signal distance limits verified