cc/td/doc/product/ong/15400/r60docs
hometocprevnextglossaryfeedbacksearchhelp
PDF

Table Of Contents

Add and Remove Cards and Nodes

Before You Begin

NTP-G107 Remove and Replace DWDM Cards

DLP-G254 Place OPT-BST and OPT-PRE Ports Out of Service

DLP-G318 Place OPT-BST and OPT-PRE Ports In Service

NTP-G127 Add an AD-xC-xx.x Card to an OADM Node

NTP-G129 Add a DWDM Node

NTP-G130 Remove a DWDM Node


Add and Remove Cards and Nodes


This chapter provides procedures for adding and removing dense wavelength division multiplexing (DWDM) cards and nodes.


Note Unless otherwise specified, "ONS 15454" refers to both ANSI and ETSI shelf assemblies.


Before You Begin

Before performing any of the following procedures, investigate all alarms and clear any trouble conditions. Refer to the Cisco ONS 15454 SONET and DWDM Troubleshooting Guide or the Cisco ONS 15454 SDH Troubleshooting Guide as necessary for general troubleshooting information and alarm or error descriptions.

This section lists the chapter procedures (NTPs). Turn to a procedure to view its tasks (DLPs).

1. G107 Remove and Replace DWDM Cards—Complete as needed.

2. G127 Add an AD-xC-xx.x Card to an OADM Node—Complete as needed.

3. G129 Add a DWDM Node—Complete as needed.

4. G130 Remove a DWDM Node—Complete as needed.

NTP-G107 Remove and Replace DWDM Cards

Purpose

This procedure removes and replaces DWDM cards installed in the ONS 15454 shelf and rack.

Tools/Equipment

None

Prerequisite Procedures

A card installation procedure

Required/As Needed

As needed

Onsite/Remote

Onsite

Security Level

Provisioning or higher



Caution Removing and replacing cards can be traffic affecting.


Caution Do not use this procedure to replace a TCC2 or TCC2P card. To replace a TCC2/TCC2P card, refer to the Cisco ONS 15454 Troubleshooting Guide or the Cisco ONS 15454 SDH Troubleshooting Guide.


Step 1 Complete the "DLP-G46 Log into CTC" task.


Note If you cannot log into Cisco Transport Controller (CTC) and you need to remove a card, remove the card as described in Step 5. After you log into CTC, troubleshoot the mismatched equipment alarm (MEA) with the Cisco ONS 15454 Troubleshooting Guide or the Cisco ONS 15454 SDH Troubleshooting Guide.


Step 2 Click the Alarms tab.

a. Verify that the alarm filter is not on. See the "DLP-G128 Disable Alarm Filtering" task as necessary.

b. Verify that no unexplained alarms appear on the network. If alarms appear, investigate and resolve them before continuing. Refer to the Cisco ONS 15454 Troubleshooting Guide or the Cisco ONS 15454 SDH Troubleshooting Guide for procedures.

Step 3 Complete the following tasks, as needed:

If the card carries unprotected circuits, you must delete them. Complete the "DLP-G106 Delete Optical Channel Network Connections" task.

If the card you want to replace is an active transponder (TXP) or muxponder (MXP) in a Y-cable protection group, complete the "DLP-G179 Apply a Force Y-Cable or Splitter Protection Switch" task on page 10-35 to force traffic away from the TXP or MXP that you will remove. If the card you want to replace is the standby TXP or MXP in a Y-cable protection group, complete the "DLP-G182 Apply a Lockout" task on page 10-37 to prevent traffic from switching to the TXP or MXP that you will remove.

If the card is an OSCM or OSC-CSM that is used as a node timing reference, complete the "NTP-G112 Change the Node Timing Reference" procedure on page 13-17.

If the card is an OSCM or OSC-CSM with an optical service channel (OSC) or generic communications channel (GCC) termination, complete the "NTP-G85 Modify or Delete OSC Terminations, GCC Terminations, and Provisionable Patchcords" procedure on page 10-39.


Note If you delete a card in CTC but do not remove it from the shelf, it will reboot and reappear in CTC.


Step 4 Complete the "DLP-G254 Place OPT-BST and OPT-PRE Ports Out of Service" task.

Step 5 Physically remove the card:

a. Disconnect any cables.

b. Open the card latches/ejectors.

c. Use the latches/ejectors to pull the card forward and away from the shelf.

Step 6 Insert the new card using one of the following procedures as applicable:

NTP-G30 Install the DWDM Cards, page 3-39

NTP-G32 Install the Transponder and Muxponder Cards, page 3-43

Step 7 Continue with the "NTP-G34 Install Fiber-Optic Cables on DWDM Cards and DCUs" procedure on page 3-48.

Step 8 Complete the following tasks or procedures, as needed:

If you switched a Y-cable protection group in Step 3, complete the "DLP-G180 Clear a Manual or Force Y-Cable or Splitter Protection Switch" task on page 10-36.

If you deleted circuits in Step 3, complete the "DLP-G105 Provision DWDM Optical Channel Network Connections" task.

If you switched the timing reference in Step 3, complete the "NTP-G112 Change the Node Timing Reference" procedure on page 13-17.

If you deleted an OSC or GCC termination in Step 3, complete the "NTP-G38 Provision OSC Terminations" procedure on page 3-84 or the "DLP-G76 Provision GCC Terminations" task.

If you placed OPT-PRE or OPT-BST cards out of service, complete the "DLP-G318 Place OPT-BST and OPT-PRE Ports In Service" task.

Step 9 Click the Alarms tab.

a. Verify that the alarm filter is not on. See the "DLP-G128 Disable Alarm Filtering" task as necessary.

b. Verify that no unexplained alarms appear on the network. If alarms appear, investigate and resolve them. Refer to the Cisco ONS 15454 Troubleshooting Guide or the Cisco ONS 15454 SDH Troubleshooting Guide for procedures.

Stop. You have completed this procedure.


DLP-G254 Place OPT-BST and OPT-PRE Ports Out of Service

Purpose

This task places OPT-BST and OPT-PRE card ports out of service in preparation for card removal.

Tools/Equipment

None

Prerequisite Procedures

G46 Log into CTC

Required/As Needed

As needed

Onsite/Remote

Onsite or remote

Security Level

Provisioning or higher



Step 1 On the shelf graphic in CTC, double-click the OPT-BST or OPT-PRE card with the ports that you want to put out of service.

Step 2 Click the Provisioning > Optical Line > Parameters tabs.

Step 3 Under Admin State, choose OOS,DSBLD (ANSI) or Locked,disabled (ETSI) for each port that does not have an OOS-MA,DSBLD or Locked-disabled service state.

Step 4 Click Apply.

Step 5 In the confirmation dialog box, click Yes.

Step 6 Click the Provisioning > Opt Apli Line > Parameters tabs.

Step 7 Under Admin State, choose OOS,DSBLD or Locked,disabled (ETSI) for each port that does not have an OOS-MA,DSBLD or Locked,disabled service state.

Step 8 Click Apply.

Step 9 In the confirmation dialog box, click Yes.

Step 10 Return to your originating procedure (NTP).


DLP-G318 Place OPT-BST and OPT-PRE Ports In Service

Purpose

This task places OPT-BST and OPT-PRE card ports in service.

Tools/Equipment

None

Prerequisite Procedures

G46 Log into CTC

Required/As Needed

As needed

Onsite/Remote

Onsite or remote

Security Level

Provisioning or higher



Step 1 On the shelf graphic in CTC, double-click the OPT-BST or OPT-PRE card with the ports that you want to put in service.

Step 2 Click the Provisioning > Optical Line > Parameters tabs.

Step 3 Under Admin State, choose choose IS (ANSI) or Unlocked (ETSI) for Port 1 of the OPT-PRE or Ports 2 and 3 of the OPT-BST.

Step 4 Click Apply.

Step 5 In the confirmation dialog box, click Yes.

Step 6 Return to your originating procedure (NTP).


NTP-G127 Add an AD-xC-xx.x Card to an OADM Node

Purpose

This procedure adds an AD-xC-xx.x card to an optical add/drop multiplexing (OADM) node.

Tools/Equipment

None

Prerequisite Procedures

Chapter 3, "Turn Up a Node"

A Cisco MetroPlanner OADM site plan recalculated for the new OADM card

Required/As Needed

As needed

Onsite/Remote

Onsite

Security Level

Provisioning or higher



Note Do not begin this procedure until the Cisco MetroPlanner site plan has been recalculated with the new AD-xCxx.x card added to the OADM node.



Note During this procedure, you will use TL1 commands to delete and recreate optical channel network connection (OCHNC) cross-connects. You might need to refer to the Cisco ONS SONET TL1 Command Guide or the Cisco ONS 15454 SDH TL1 Command Guide



Caution This procedure will affect the service of unprotected circuits that pass through the OADM node.


Step 1 Complete the "DLP-G46 Log into CTC" task at a node on the OADM network.

Step 2 In node view, display the OADM node where you will add the card.

Step 3 Click the Circuits tab.

Step 4 Make a list of all OCHNCs that are carried on the express path for both east-to-west (E > W) and west-to-east (W > E) directions.

Step 5 For OCHNCs identified in Step 4 that are routed on the active path of a splitter or Y-cable protection group, force the traffic to the protect path in the opposite side of the ring using the "DLP-G179 Apply a Force Y-Cable or Splitter Protection Switch" task on page 10-35.

Step 6 Click the Circuits tab.

Step 7 Complete the following steps for all OCHNCs carried on the express path that were identified in Step 4:

a. Choose the OCHNC circuit(s) and click Edit. (To choose multiple circuits, press the Shift key while you click the circuits.)

b. In the Edit Circuit dialog box, click the State tab.

c. In the Target Circuit Admin State drop-down list, choose OOS,DSBLD (ANSI) or Locked,disabled (ETSI).

d. Click Apply.

e. Repeat Steps a through d for each OCHNC circuit.

Step 8 From the Tools menu, choose Open TL1 Session.

Step 9 In the Select Node dialog box, choose the OADM node where you will add the AD-xCxx.x card and click OK.

Step 10 In the TL1 dialog box, use the DLT-WLEN command to delete the OCHNC cross-connects for the express path OCHNCs listed in Step 4, as follows:

DLT-WLEN:[<TID>]:<AID>:<CTAG>[:::CMDMDE=<CMDMDE>];

where:

<AID> is the wavelength AID per ring direction from the wavelength (WLEN) section.

<CMDMDE> indicates the command execution mode.

For additional information, including valid command values, refer to the Cisco ONS SONET TL1 Command Guide or the Cisco ONS 15454 SDH TL1 Command Guide.

Step 11 Close the TL1 session.

Step 12 In node view, click the Provisioning > WDM-ANS > Connections tabs.

Step 13 Highlight the two express connections that carry the circuits passing through the node. (The express connections are the only ones connecting an EXP_TX port on the last west-side OADM card, W > E, with an EXP_RX port on the first east-side OADM card, W > E.)

Step 14 Click Delete.

Step 15 Remove the physical express cables between the EXP_TX and EXP_RX ports specified in Step 13.

Step 16 Insert the new AD-xCxx.x card in the slot identified by your Cisco MetroPlanner site plan.

Step 17 Complete the "NTP-G34 Install Fiber-Optic Cables on DWDM Cards and DCUs" procedure on page 3-48 for the OADM node, following the new internal connections table generated by Cisco MetroPlanner.

Step 18 Complete the "NTP-G36 Calculate Cable Connections" procedure on page 3-80.

Step 19 Import the recalculated OADM site parameters. See the "NTP-G138 Import a Cisco MetroPlanner Configuration File" task on page 3-82.

Step 20 In node view, click the Provisioning > WDM-ANS > Port Status tabs.

Step 21 Click Launch ANS.

Step 22 From the Tools menu, choose Open TL1 Session.

Step 23 In the Select Node dialog box, choose the OADM node and click OK.

Step 24 In the TL1 dialog box, use the ENT-WLEN command to create the OCHNC cross-connects that were deleted in Step 10, as follows:

ENT-WLEN:[<TID>]:<AID>:<CTAG>:::[SIZE=<SIZE>]:[<PST>],[<SST>];

where:

<AID> is the wavelength AID.

<SIZE> is the circuit size allocated on this wavelength.

<PST> is the primary state.

<SST> is the secondary state.

For additional information and a list of valid command values, see the Cisco ONS SONET TL1 Command Guide or the Cisco ONS 15454 SDH TL1 Command Guide.

Step 25 Close the TL1 dialog box.

Step 26 In node view, click the Circuits tab.

Step 27 Complete the following steps for all OCHNCs set to OOS,DSBLD or Locked,disabled in Step 7:

a. Choose the OCHNC circuit(s) and click Edit. To choose multiple circuits, press the Shift key while you click the circuits.

b. In the Edit Circuit dialog box, click the State tab.

c. In the Target Circuit Admin State window, choose IS,AINS (ANSI) or Unlocked,automaticInService (ETSI).

d. Click Apply.

Step 28 Complete the "DLP-G180 Clear a Manual or Force Y-Cable or Splitter Protection Switch" task on page 10-36 for OCHNCs that were switched to the opposite side of the ring as part of a splitter or Y-cable protection group.

Stop. You have completed this procedure.


NTP-G129 Add a DWDM Node

Purpose

This procedure adds a DWDM node to an existing Multi-Service Transport Platform (MSTP) network.

Tools/Equipment

None

Prerequisite Procedures

Chapter 3, "Turn Up a Node"

A Cisco MetroPlanner network plan recalculated for the new node

Required/As Needed

As needed

Onsite/Remote

Onsite

Security Level

Provisioning or higher



Note Do not begin this procedure until the Cisco MetroPlanner network plan has been updated and recalculated with the new DWDM node.



Note During this procedure, you will use TL1 commands to delete and recreate OCHNC cross-connects. You might need to refer to the Cisco ONS SONET TL1 Command Guide or the Cisco ONS 15454 SDH TL1 Command Guide.



Caution To complete this procedure, a span will be disconnected where the new node is added. This will affect the service of any unprotected circuits that pass through that span.


Step 1 If the Cisco MetroPlanner network design has not been updated and recalculated for the new node and client services, update and recalculate it now, following the procedures in the Cisco MetroPlanner documentation.

Step 2 Identify the fiber span that must be disconnected to insert the new node.

Step 3 Complete the "DLP-G46 Log into CTC" task at a DWDM node that is active on the network.

Step 4 In network view, click the Circuits tab.

Step 5 Identify the OCHNCs that are carried on the fiber span that you identified in Step 2 in both the east-to-west and west-to-east directions.

Step 6 If the OCHNC circuit is on the active path and is protected by a splitter or Y-cable protection group, complete the "DLP-G179 Apply a Force Y-Cable or Splitter Protection Switch" task on page 10-35 to force traffic away from the span where the node will be added. If not, continue with Step 7.

Step 7 For each circuit identified in Step 5 that was not switched in Step 6 (unprotected circuits), complete the following steps:

a. Select the circuit and click Edit.

b. In the Edit Circuit dialog box, click the State tab.

c. In the Target Circuit Admin State field, choose choose OOS,DSBLD (ANSI) or Locked,disabled (ETSI).

Step 8 Remove the fibers from the cards at the adjacent nodes that will connect to the new node.

Step 9 At the node that will be added, complete the following procedures and tasks:

NTP-G22 Verify Common Card Installation, page 3-4

NTP-G26 Set Up CTC Network Access, page 3-11

NTP-G30 Install the DWDM Cards, page 3-39

NTP-G36 Calculate Cable Connections, page 3-80

NTP-G138 Import a Cisco MetroPlanner Configuration File, page 3-82

NTP-G37 Run Automatic Node Setup, page 3-83

Node acceptance tests in Chapter 4, "Perform Node Acceptance Tests"

Step 10 Create cross-connects on the new node for all circuits identified in Step 5:

a. From the Tools menu, choose Open TL1 Session.

b. In the Select Node dialog box, choose the new node and click OK.

c. In the TL1 dialog box, use the ENT-WLEN command to create the OCHNC cross-connects for each unprotected pass-through circuit as follows:

ENT-WLEN:[<TID>]:<AID>:<CTAG>:::[SIZE=<SIZE>]:[<PST>],[<SST>];

where:

<AID> is the wavelength AID.

<SIZE> is the circuit size allocated on this wavelength.

<PST> is the primary state.

<SST> is the secondary state.

For additional information and a list of valid command values, see the Cisco ONS SONET TL1 Command Guide or the Cisco ONS 15454 SDH TL1 Command Guide.

d. Close the TL1 dialog box.

e. Repeat Step 7 to change the circuits placed in OOS-DSLBD or Locked,disabled back in service by choosing IS,AINS (ANSI) or Unlocked,automaticInService (ETSI).in the Target Circuit Admin State field.

Step 11 Complete the "DLP-G180 Clear a Manual or Force Y-Cable or Splitter Protection Switch" task on page 10-36 for the circuits that were switched in Step 7.

Step 12 Complete the "DLP-G106 Delete Optical Channel Network Connections" task for circuits identified in Step 5 that will not be part of the traffic matrix after the node is added.

Step 13 Divide the circuits that existed previously into two groups: those that will terminate in the new node and those that will pass through it.

Step 14 For circuits that will terminate in the new node, complete the "DLP-G106 Delete Optical Channel Network Connections" task and then the "DLP-G105 Provision DWDM Optical Channel Network Connections" task.

Step 15 Complete the "DLP-G105 Provision DWDM Optical Channel Network Connections" task to create new circuits.

Stop. You have completed this procedure.


NTP-G130 Remove a DWDM Node

Purpose

This procedure removes a DWDM node from an MSTP network.

Tools/Equipment

None

Prerequisite Procedures

Chapter 3, "Turn Up a Node"

A Cisco MetroPlanner network plan recalculated for the new node

Required/As Needed

As needed

Onsite/Remote

Onsite

Security Level

Provisioning or higher



Note Do not begin this procedure until the Cisco MetroPlanner network plan has been updated and recalculated with the DWDM node removed.



Note During this procedure, you will use TL1 commands to delete and recreate OCHNC cross-connects. You might need to refer to the Cisco ONS SONET TL1 Reference Guide or the Cisco ONS 15454 SDH TL1 Reference Guide.



Caution This procedure will affect the service of unprotected circuits that pass through the span where the node will be removed.


Step 1 If the Cisco MetroPlanner network design has not been updated and recalculated with the node removed, update and recalculate it now, following the procedures in the Cisco MetroPlanner documentation.

Step 2 Complete the "DLP-G46 Log into CTC" task at the DWDM node that will be removed.

Step 3 Click the Circuits tab.

Step 4 Identify the OCHNCs that pass through or are added and dropped at the node that will be removed, in both east-to-west and west-to-east directions.

Step 5 If OCHNC circuits pass through the node to be removed on the active path and are protected by a splitter or Y-cable protection group, navigate to a node connected to the node that will be removed and complete the "DLP-G179 Apply a Force Y-Cable or Splitter Protection Switch" task on page 10-35. Otherwise, continue with Step 6.

Step 6 Complete the following steps for each circuit identified in Step 4 that was not switched in Step 5:

a. Select the circuit and click Edit.

b. In the Edit Circuit dialog box, click the State tab.

c. In the Target Circuit Admin State field, choose OOS,DSBLD (ANSI) or Locked,disabled (ETSI).

Step 7 Delete the cross-connects on the node that will be removed for each circuit placed in the OOS-DSLBD or Locked,disabled state in Step 6:

a. From the Tools menu, choose Open TL1 Session.

b. In the Select Node dialog box, select the new node and click OK.

c. In the TL1 dialog box, use the DLT-WLEN command to delete the OCHNC cross-connects for each unprotected pass-through circuit as follows:

DLT-WLEN:[<TID>]:<AID>:<CTAG>:::[SIZE=<SIZE>]:[<PST>],[<SST>];

where:

<AID> is the wavelength AID.

<SIZE> is the circuit size allocated on this wavelength.

<PST> is the primary state.

<SST> is the secondary state.

For additional information and a list of valid command values, see the Cisco ONS SONET TL1 Reference Guide or the Cisco ONS 15454 SDH TL1 Reference Guide.

d. Close the TL1 dialog box.

e. Repeat Step 6 to change the circuits placed in OOS-DSLBD back in service by changing the Target circuit Admin State field to IS,AINS (ANSI) or Unlocked,automaticInService (ETSI).

Step 8 Complete the "DLP-G180 Clear a Manual or Force Y-Cable or Splitter Protection Switch" task on page 10-36 for the circuits that were switched in Step 5.

Step 9 Complete the "DLP-G106 Delete Optical Channel Network Connections" task to delete circuits identified in Step 4 that will terminate (add/drop) on the new DWDM node.

Step 10 Complete the "DLP-G105 Provision DWDM Optical Channel Network Connections" task to recreate circuits identified in Step 4 that will terminate on the new DWDM node. Choose the new DWDM node as the start/end (add/drop, respectively) for each circuit.

Step 11 Complete the "DLP-G105 Provision DWDM Optical Channel Network Connections" task to create new circuits that originate or terminate in the new DWDM node.

Stop. You have completed this procedure.