Test Results Tables


Test Results Tables


This appendix contains tables and checklists to use during the turn-up and test of a Cisco ONS 15530.

Table B-1 Test Results for the Cisco ONS 15530

Test or Procedure Section
Expected Result (After Power-up)
Notes

"Performing Fiber Plant Characterization" section

Tested fiber meets the specifications listed in that section.

 

"DLP-13 Install the Transponder Line Cards" section on page 2-17

All LEDs on the modules are off (default).

 

"DLP-34 Verify the Power Up" task on page 2-78

The Status LED is green.

The Active LED on the primary processor and the Standby LED on the standby processor are both green.

The alarm LEDs are off.

 

"NTP-8 Verify Installation of Hardware" procedure on page 2-79

All modules in the chassis are reported in the proper slot by Cisco IOS software. The modules have the correct hardware version and software version.

 

"NTP-15 Verify the Interface Status" procedure on page 4-2

Confirm that the interfaces are administratively up.

 

"NTP-16 Verify the Optical Patch Configuration" procedure on page 4-19

Confirm that the patch connections are correctly configured.

 

"DLP-52 Verify the Power Levels at the DWDM Trunk Interfaces" task on page 4-25

Tx optical power and wavelengths are in line with figures in the power specification tables.

 

"DLP-52 Verify the Power Levels at the DWDM Trunk Interfaces" task on page 4-25

Measured power matches the specifications provided.

 

"NTP-18 Verify the Transponder Line Card Laser Frequency" procedure on page 4-21

The laser frequency (channel number) is configured to the proper wavelength.

 

"NTP-20 Test the Optical Transmission Quality" procedure on page 4-28

The test runs error free for 15 minutes.

 

"NTP-21 Check the Alarms" procedure on page 4-30

Alarms are generated for the listed fault conditions.

 

"NTP-23 Verify the Optical Power Budget Between Nodes" procedure on page 5-2

Expected results (from network design), measured results, and results as seen by Cisco IOS software match.

 

"NTP-24 Verify the Connectivity Between OSC Modules" procedure on page 5-3

Active is displayed under the Status field.

2way is displayed under the OSCP St. field.

 

"NTP-26 Verify the Power Levels" procedure on page 5-4

Channel count, power, power equalization, and OSNR meet the network design requirements.

 

"NTP-27 Test the Optical Transmission Quality" procedure on page 5-5

The test runs error free for 15 minutes.

 