This appendix contains tables and checklists to use during the turn-up and test of a Cisco ONS 15540 ESPx.

Table B-1 Test Results for the Cisco ONS 15540 ESPx 

Test or Procedure Section
Expected Result (After Powerup)
Notes

"Fiber Plant Characterization" section

Tested fiber meets the specifications listed in that section.

 

"DLP-13 Install the 2.5-Gbps Line Card Motherboard" section on page 2-19

All LEDs on the modules are off (default).

 

"DLP-40 Verify the Powerup" task on page 2-66

The Status LED is green.

The Active LED on the primary processor and the Standby LED on the standby processor are both green.

The alarm LEDs are off.

 

"NTP-8 Verify Installation of Hardware" procedure on page 2-66

All modules in the chassis are reported in the proper slot by Cisco IOS software. The modules have the correct hardware version and software version.

 

"NTP-15 Verify the Interface Status" procedure on page 4-2

The interfaces are administratively up.

 

"NTP-16 Verify the Optical Patch Configuration" procedure on page 4-11

The patch connections are correctly configured.

 

"DLP-65 Verify the Power Levels at the DWDM Trunk Signal" task on page 4-15

Tx optical power and wavelengths are in line with figures in the power specification tables.

 

"DLP-65 Verify the Power Levels at the DWDM Trunk Signal" task on page 4-15

Measured power matches the specifications provided.

 

"DLP-64 Verify the 2.5-Gbps Transponder Module Laser Frequency" procedure on page 4-13

The laser frequency (channel number) is configured to the proper wavelength.

 

"NTP-20 Verify the Optical Transmission Quality" procedure on page 4-23

The test runs error free for 15 minutes.

 

"NTP-21 Verify the Alarm Status" procedure on page 4-27

Alarms are generated for the listed fault conditions.

 

"NTP-23 Verify the Optical Power Budget Between Nodes" procedure on page 5-2

Expected results (from network design), measured results, and results as seen by Cisco IOS software match.

 

"NTP-24 Verify the Connectivity Between OSC Modules" procedure on page 5-3

Active is displayed under the Status field.

2way is displayed under the OSCP St. field.

 

"NTP-26 Verify the Power Levels" procedure on page 5-4

Channel count, power, power equalization, and OSNR meet the network design requirements.

 

"NTP-27 Test the Optical Transmission Quality" procedure on page 5-5

The test runs error free for 15 minutes.

 


hometocprevnextglossaryfeedbacksearchhelp

Posted: Wed Jan 12 13:41:58 PST 2005
All contents are Copyright © 1992--2005 Cisco Systems, Inc. All rights reserved.
Important Notices and Privacy Statement.