Preparing for Installation


This section describes how to prepare your site for installation of the Catalyst 4224 Access Gateway Switch. This section contains the following topics:

Safety


Warning Before you install, operate, or service the system, read Regulatory Compliance and Safety Information for Catalyst 4200 Series Access Gateway Switch. This guide contains important safety information you should know before working with the system.


Warning For Nordic countries (Norway, Finland, Sweden and Denmark) this system must be installed in a Restricted Access Location, where the voltage of the main ground connection of all equipment is the same (equipotential earth) and the system is connected to a grounded electrical outlet.

Site Requirements

This section provides site power requirements for the Catalyst 4224. You should verify site power before you install a switch.

The following sections are included:

Environmental Requirements

Table 2-1 describes the power requirements for the Catalyst 4224.

Unless otherwise noted, the information in Table 2-1 assumes worst-case conditions. Typical numbers are approximately 30 percent below the numbers listed here.

Table 2-1   Power Requirements Specifications

Model Number/
Module Type
Power Supply Output (Watts) AC Input
Power (Watts)
AC Input Current at 90 VAC (Amps) AC Input Current at 120 VAC (Amps) AC Input Current at 180 VAC (Amps) AC Input Current at 240 VAC (Amps)

Catalyst 4224 Access Gateway Switch

240W

345W

3.8A

3A

2A

1.5A

Power Requirements

Knowing the power requirements can be useful for planning the power distribution system needed to support the switches. Heat dissipation specifications are an important consideration for sizing air-conditioning requirements for an installation.

Follow these requirements when preparing your site for the switch installation:

Use the information in Table 2-1 to estimate the power requirements and heat dissipation of a Catalyst 4224.

Site-Planning Checklist

Table 2-2 lists the site-planning activities that you should complete before you install the Catalyst 4224. Completie each activity to help ensure a successful switch installation.

Table 2-2   Site-Planning Checklist

Task No. Planning Activity Verified By Time Date

1

Space evaluation:

Space and layout
Floor covering
Impact and vibration
Lighting
Maintenance access

 

 

 

2

Environmental evaluation:

Ambient temperature
Humidity
Altitude
Atmospheric contamination
Airflow

 

 

 

3

Power evaluation:

Input power type
Proximity of receptacle to the equipment
Dedicated (separate) circuits for redundant power supplies
UPS for power failures

 

 

 

4

Grounding evaluation:

Circuit breaker size

 

 

 

5

Cable and interface equipment evaluation:

Cable type
Connector type
Cable distance limitations
Interface equipment (transceivers)

 

 

 

6

EMI evaluation:

Distance limitations for signaling
Site wiring
RFI levels

 

 

 


hometocprevnextglossaryfeedbacksearchhelp
Posted: Sat Jan 18 12:46:59 PST 2003
All contents are Copyright © 1992--2002 Cisco Systems, Inc. All rights reserved.
Important Notices and Privacy Statement.