Table of Contents
index
- ACT LED 1-9
- adapter pinouts B-4
- auxiliary port pinouts B-4
- bridging
- capabilities 1-2
- figure 1-3
- maximum CPE devices 1-2
- cable
- jacks, in wet locations 2-3
- RJ-45 pinout B-3
- safety guidelines 2-3
- ungrounded and uninsulated 2-3
- Cable Activity LED 1-9
- Cable Link LED 1-9, 4-6
- cable modem
- definition 1-1
- figure of a typical data cable system 1-18
- cautions
- antistatic strap 2-4
- cable modem, overheating 2-6
- do not connect power 3-4
- incorrect configuration file 1-14
- maximum REN value 3-8
- power supply and cord 1-12
- scoring coaxial cable connectors 2-8
- using proper power cords 2-6
- voice operations regulation 1-4, 1-21
- coaxial cable 4-7
- condition of 4-8
- subsystem for troubleshooting 4-7
- configuration files
- Cisco IOS 1-17
- DOCSIS 1-12, 1-16
- connections
- coaxial cable 3-6, 3-7
- power 3-4
- console port
- adapter B-4
- pinouts B-4
- signals B-4
- console terminal, system banner display B-5
- crossover cable connection B-3, B-6
- data operations
- description 1-17
- downstream transmissions 1-18
- upstream transmissions 1-19
- distance limitations, transmission 2-8
- DOCSIS
- configuration file 1-12, 1-16
- configuration file problems 1-14
- description 1-1
- power-on sequence 1-13
- provisioning 1-12
- RF interface specification 1-16
- downstream transmissions
- description 1-18
- frequency range 1-18
- DS LED 1-9, 4-6
- DSNR LED 1-10, 4-6
- electromagnetic pulse (EMP), avoiding 2-7
- EMI, shielding 2-3
- Ethernet LED 1-9, 4-5
- figures
- bridging configuration 1-3
- front view of the router 1-7
- provisioning overview 1-15
- rear view 1-7
- routing configuration 1-3
- typical data cable system 1-18
- incorrect configuration file 1-14
- initial power-on
- description 1-12
- sequence of steps 1-13
- installation
- connecting the CATV cable 3-6, 3-7
- interference, radio frequency 2-7
- IOS images, upgrading 1-17
- jewelry, avoiding for safety 2-2
- LEDs
- 1 4-5
- ACT 1-9
- Cable Activity 1-9
- Cable Link 1-9, 4-6
- description 1-8
- DS 1-9, 4-6
- DSNR 1-10, 4-6
- Ethernet 1-9, 4-5
- LINK 1-9
- Link 4-6
- Message Waiting 1-10
- MSG 1-10
- OK 1-9, 4-5
- System Status 1-9, 4-5
- US 1-9, 4-6
- USB 1-9, 4-5
- V1 1-9
- V2 1-9
- Voice Port 1-9
- Voice System Status 1-9
- V OK 1-9
- lightning storm, safety during 2-3
- LINK LED 1-9
- MAX CPE parameter 1-3
- maximum CPE devices 1-3
- Message Waiting LED 1-10
- MSG LED 1-10
- note, description of x
- OK LED 1-9
- operations
- data connections 1-17
- LED descriptions 1-8
- voice connections 1-4, 1-21
- pinouts
- RJ-45 B-3
- power
- connections 3-4
- site requirements 3-4
- subsystem for troubleshooting 4-7
- surge suppression 2-7
- ungrounded 2-3
- power supply, physical description 1-11
- prerequisites
- provisioning 1-16
- problem solving, subsystem 4-3
- procedures
- connecting the CATV cable 3-6, 3-7
- provisioning
- description 1-12
- overview (figure) 1-15
- power-on sequence 1-13
- prerequisites 1-16
- REN value, maximum 3-8
- RJ-45
- cable B-3
- routing
- capabilities 1-2
- figure 1-3
- maximum CPE devices 1-2
- safety recommendations
- electrical 2-3
- preventing electrostatic discharge damage 2-3
- site requirements
- environment 2-6
- power 3-4
- software images, upgrading 1-17
- SP-RFII01-990731 RF interface specification 1-16
- subsystems for troubleshooting
- coaxial cable 4-7
- power 4-7
- system specifications A-1
- System Status LED 1-9, 4-5
- timesaver, description x
- troubleshooting
- coaxial cable subsystem 4-7
- identifying installation problems 4-1
- power subsystem 4-7
- strategy 4-4
- upgrading IOS images 1-17
- Upstream LED 4-6
- upstream transmissions
- description 1-19
- frequency range 1-19
- USB LED 1-9, 4-5
- US LED 1-9
- V1 LED 1-9
- V2 LED 1-9
- voice operations
- caution about regulation of VoIP operations 1-4, 1-21
- description 1-4, 1-21
- Voice over IP
- See VoIP
- Voice Port LEDs 1-9
- Voice System Status LED 1-9
- VoIP
- caution 1-21
- LEDs 1-9
- operations 1-4, 1-21
- troubleshooting 4-13
- V OK LED 1-9
- warnings
- ground conductor requirement 1-12, 3-5
- ground connector requirement 3-4
- jewelry removal 2-2
- lightning activity 2-2
- proper disposal 2-10
- proper grounding of router 2-2
- reading the installation instructions 1-12, 3-4
- ring signal generator voltages 3-8
- TN power systems 1-12
- trained and qualified personnel 2-1
- unplug power cord before working 2-3
- unplug the power cord 3-6
- warning symbol definition x, 2-1
- wiring
- quality and requirements 2-7
Posted: Sat Jun 30 17:13:16 PDT 2001
All contents are Copyright © 1992--2001 Cisco Systems, Inc. All rights reserved.
Important Notices and Privacy Statement.