|
When a LightStream 2020 multiservice ATM switch (LS2020 Switch) arrives at your site, unpack it using the procedure below.
Step 1 Before moving the shipping container from your loading dock, inspect it for any signs of in-transit damage.
Step 2 Transfer the container to the systems area, remove the cardboard box, and remove the packing material.
Step 3 Locate the power cord(s) and mounting hardware.
Step 4 Inspect all external surfaces for signs of damage. Pay special attention to any areas of damage to the shipping container. Document any damage noted during the inspections and notify your LS2020 vendor.
Step 5 See the LightStream 2020 Installation Guide for instructions on installing the LS2020 switch.
|