Installation Documentation
THIS SITE IS NO LONGER MAINTAINED Click
here
go to the current site.
Site Preparation and Network Communications Requirements
Network Site Survey (Release 4.5.x up to 4.5.1V12)
Network Site Survey (Release 4.5.1V14 and above)
Cisco BTS 10200 Softswitch Release 3.3 Building Environment and Power Site Survey
This is the latest release of this document.
Cabling, VLAN, and IRDP Setup Procedure
This document applies to Releases 4.4.x, 4.5.x, 5.x, and later.
BTS_Jumpstart_Procedure_for_Solaris-Sun-Sparc-10-0-0503-V02
Use this jumpstart procedure for Release 4.5.1 systems.
BTS_Jumpstart_Procedure_for_Solaris-Sun-Sparc-10-0-10001
Use this jumpstart procedure for Release 4.5.0 systems.
Application Installation Procedure (Release 4.5.0V13 and before)
Application Installation Procedure (Release 4.5.13, 4.5.0V14 and above, 4.5.1) - Revised January 2, 2007
Oracle Engine Software Creation Procedure
For Releases 4.5.x.
Cisco BTS 10200 NIDS Generator (Release 4.5.1V14 and above) - Revised December 15, 2006
Cisco BTS 10200 NIDS Generator (Release 4.5.13, 4.5.0V07 and above, 4.5.1 up to 4.5.1V12)
Cisco BTS 10200 NIDS Generator (Release 4.5.0V06 and before)
All contents are copyright © 1992--2007 Cisco Systems, Inc. All rights reserved.
Important Notices
and
Privacy Statement
.