background image
Scenario 9-3 285
Scenario 9-2
The Frame Relay configurations from the previous scenario have been placed on each router.
However, the PVCs still show as inactive.
1
List the show commands used in troubleshooting the configuration.
2
List the debug commands used in troubleshooting the configuration.
3
It has been determined that there is no LMI traversing the link between the router and the
switch. What are the possible causes and cures?
Scenario 9-3
Now that the basic configurations are complete and the PVCs are active, it has been determined
that Routers B, C, and D are being overloaded with traffic from Router A.
1
Implement traffic shaping on Router A so that it cannot overload the remote routers.
2
Configure all four routers so that they respond to BECN requests to step down
transmission rates.
3
On Routers B, C, and D, configure CIR, MinCIR, Be, and Bc appropriately.